CCIL 14:22: Change of aspect — Hubberts Bridge

Delay curve and recovery numbers, for sanity-checking the correlation independently of the map.

Trains impacted
1
Recovered
0/1
1 terminated still delayed
Total delay
9
delay-minutes above baseline
Median recovery
minutes from incident onset
Max recovery
minutes from incident onset

Delay curve per train

Signed timetable variation (minutes late) at each reporting point. Shaded band = incident window; dashed line = recovery tolerance (2 min).

Delay in the system

Sum of positive lateness across affected trains, 5-minute buckets — should build after onset and decay as trains recover.

Affected trains

TrainFirst report (near incident)BaselineAt incidentPeakRecoveryStatus
552S17ML18Boston Rail Station · 15:2708 min9 min✗ still delayed (8 min)