CCIL 10:04: 1F20 brake control fault (810012) — MML

Delay curve and recovery numbers, for sanity-checking the correlation independently of the map.

Trains impacted
8
Recovered
1/8
7 terminated still delayed
Total delay
77
delay-minutes above baseline
Median recovery
260
minutes from incident onset
Max recovery
260
minutes from incident onset

Delay curve per train

Signed timetable variation (minutes late) at each reporting point. Shaded band = incident window; dashed line = recovery tolerance (2 min).

Delay in the system

Sum of positive lateness across affected trains, 5-minute buckets — should build after onset and decay as trains recover.

Affected trains

TrainFirst report (near incident)BaselineAt incidentPeakRecoveryStatus
631F30MI21Loughborough (Leics) Rail Station · 13:18n/a4 min8 min✗ still delayed (8 min)
631D31MI21Loughborough (Leics) Rail Station · 13:30n/a3 min4 min✗ still delayed (3 min)
494M82CC21Loughborough (Leics) Rail Station · 13:37n/a10 min13 min260 min (at 56628)✓ recovered
631F32MJ21Loughborough (Leics) Rail Station · 13:51n/a6 min7 min✗ still delayed (7 min)
251C50ML21Loughborough (Leics) Rail Station · 14:25n/a6 min15 min✗ still delayed (12 min)
595Q401L21Sileby Rail Station · 14:54n/a3 min8 min✗ still delayed (4 min)
251C53MM21Loughborough (Leics) Rail Station · 14:54n/a3 min5 min✗ still delayed (3 min)
631F37ML21W70975Loughborough (Leics) Rail Station · 15:00n/a16 min17 min✗ still delayed (16 min)
NP251C65MQ21W70812Sheffield Rail Station · 16:04n/a4 min25 min✗ still delayed (23 min)